Munster Energy Center is a proposed 100 megawatt battery energy storage system developed by East Point Energy (an Equinor company) in Chesterfield County, Virginia. This project would capture and store power when it’s abundant, and release it back onto the grid when it’s needed most. The project would be located on under 40 acres at 730 Watkins Centre Parkway (Midlothian District), south of East West Road. Right now, it’s seeking rezoning (26SN2174) from Employment Center to Employment General, plus a conditional use permit for a battery energy storage facility. This developer has already brought two previous projects to our community, and this one received a unanimous recommendation for approval from the County Planning Commission.
Battery storage helps keep the grid reliable, reduces strain during peak demand, and makes it easier to use more clean energy. That means decreasing reliance on harmful, polluting peaker plants, since energy storage is the less expensive option, meaning that PJM will source from BESS projects before sourcing from peaker plants. Battery storage projects also bring in valuable local investment, including millions in additional tax revenue that can help fund local services like roads, schools, and first responders.
Right now, there are two important ways you can help bring this beneficial project to Chesterfield County:
Option 1: Speak at the Board of Supervisors Meeting
- Date: Wednesday, November 18, 2026
- Time: 6 p.m.
- Location: Chesterfield County Public Meeting Room, 10001 Iron Bridge Road, Chesterfield, VA 23831
- Watch live: chesterfield.gov/WCCT or the county’s YouTube channel
Each speaker gets 3 minutes, and each person may speak once per meeting. You can sign up to speak in person once you arrive; there’s no need to register in advance.
Keep your remarks focused on why you support the project: grid reliability, local economic benefits, clean energy, and your own connection to the community. The voices of residents and especially people who live or work in Chesterfield carry the most weight.
Option 2: Email the Board
Please send a short note in support, and mention that you’re a Chesterfield or Richmond-area resident if you are. Reference “Munster BESS (26SN2174)” in the subject line.
- Mark Miller, Chair, Midlothian District (where the project is located): MillerMark@chesterfield.gov
- Kevin Carroll, Vice Chair, Matoaca District: CarrollKevin@chesterfield.gov
- Jim Ingle, Bermuda District: IngleJ@chesterfield.gov
- Jessica Schneider, Clover Hill District: SchneiderJes@chesterfield.gov
- LeQuan Hylton, Dale District: HyltonL@chesterfield.gov
There’s also the Board phone, which residents can call and use to leave a supportive message, at 804-748-1211. In addition to reaching out to Board members directly, you can also submit comments through the county’s online comment portal. It closes at 5 p.m. the day before the meeting.
Whether you’re sending an email or submitting a comment, personalized messages are always strongest, but here’s a quick template to get you started:
“Dear Supervisors, I’m a resident of [city/district] and I support the Munster Battery Energy Storage Facility (26SN2174). Energy storage strengthens grid reliability, lowers costs during peak demand, and supports Virginia’s clean energy future. I urge you to approve the rezoning and conditional use permit. Thank you for your service.”